PORTALBERITA.CO.ID - Construction is actively underway on a significant new structure on the White House grounds, specifically replacing the demolished East Wing, a project spearheaded by former President Donald Trump. This development has drawn renewed scrutiny regarding its escalating financial scale and funding sources.

As reported by The Washington Post on Tuesday, new figures reveal the estimated price tag for the ballroom complex has reached approximately $600 million. This represents a substantial increase from earlier projections provided by the administration.

Crucially, more than half of this massive expenditure is reportedly slated to come from public funds, contradicting previous assurances that the project would be entirely financed through private donations. This shift in funding has become a central point of contention for critics.

The cost escalation is dramatic, as the initial concept announced by Trump was budgeted at $200 million, later adjusted to $300 million, and then $400 million. Now, the reported figure has tripled the original estimate.

This is not the first attempt to secure federal financing for the development; As reported by The Logoff, in May, a proposed Senate immigration funding bill contained a $1 billion allocation designated for an "East Wing Modernization Project," which was later removed.

The soaring expense is attributed to the growing scope of the project, including extensive security features planned by the former President. According to Trump, the plans now encompass a "massive" subterranean military complex and an integrated hospital facility.

Furthermore, the structure is slated to include advanced defense capabilities, with Trump stating it will feature "the greatest drone empire that you’ve ever seen." The White House has cited national security needs as the primary justification for these expanded features.

This justification has been emphasized following recent security incidents, including a shooting at an April press dinner and a reported attack near Trump’s birthday celebration this week, although the direct utility of the ballroom in stopping the latter event remains unclear.

As reported by The Wall Street Journal over the weekend, the construction pace has been significantly accelerated to double time. This urgency stems from the administration's goal to "outrun" potential court rulings that could halt the controversial construction.